Lehdistötiedotteet
09
syys
PERI Suomen toimitusjohtaja vaihtuu
PERI Suomen toimitusjohtajaksi on 09.09.2024 alkaen nimitetty yrityksen Head of Panel Products & Components, Ilkka Akkanen. Viimeiset noin 1,5 vuotta toimitusjohtajana toiminut Egils Misans jättää tehtävänsä, ja siirtyy uusiin haasteisiin PERI Suomen ulkopuolelle.
04
heinä
Important Milestone reached in the Fehmarnbelt Tunnel project: All five production lines for standard tunnel elements in operation
At the time of its completion, the 18 km long Fehmarnbelt Tunnel will be the longest immersed tunnel in the world and is currently the largest infrastructure project in Northern Europe. PERI developed a formwork solution for the production of the 79 standard tunnel elements, characterized by high performance, productivity and compliance with high safety standards. The standard tunnel elements are manufactured in parallel on five production lines, with the latest line having commenced operations in February 2024.
17
huhti
Above water and clouds: Danjiang Bridge reaches record-breaking proportions with PERI Systems
The Danjiang Bridge over the Tamsui River on the outskirts of Taipei is taking giant strides towards record-breaking proportions. The structure, designed by Zaha Hadid, is expected to be the world’s longest asymmetric cable-stayed bridge upon completion in 2025, at an impressive 920.00 metres.
28
maalis
Opening of new school in Kenyan slum: The very first PERI school provides opportunities for the future
In Kenia wurde die erste Schule im Rahmen des PERI Nachhaltigkeitsprogramms feierlich eröffnet
The very first PERI school in Kenya opened its doors at the end of February 2024 for over 200 children. In Kibera, the largest slum in Nairobi, the first school in the PERI sustainability initiative “Building Sustainability” was built in less than a year. In collaboration with the social enterprise “Start Somewhere”, PERI developed what are known as TwistBlock Moulds for hollow concrete blocks, which were designed specifically for use in slums due to the simple and flexible manner in which they can be used. The new school building has created not only learning spaces, but also new local job opportunities.
13
helmi
Award for Denmark’s tallest residential building
The “Lighthouse 2.0” construction project has created new living space with 381 new flats in the purpose-built district of “Aarhus Ø”, not far from the centre of the city of the same name. With its impressive height of 142 metres, the building has been the tallest residential building in Denmark since its completion in 2022. The top floors are home to a restaurant and a roof terrace that is open to the public – with fantastic views of the harbour, the sea and the city. The project has now received an award for the “Best Tall Building” in the “100 to 199 metres” category from non-profit organisation, the “Council on Tall Buildings and Urban Habitat” (CTBUH).
13
joulu
Visionary stage design realised with 200 tonnes of PERI UP scaffolding
World Youth Day (WYD) is an international event where young people from all over the world gather every two or three years to meet the Pope. Founded by Pope John Paul II, WYD was first held in Rome in 1986 and has since been held in numerous cities around the world. In 2023, the event was organised in Lisbon during the first week of August and attracted around 1.5 million participants.
20
syys
Four towers grow at once thanks to PERI systems
Four up to 233-m-high futuristic towers will soon soar high into the heart of Frankfurt’s skyline in keeping with the project’s slogan “Feel the City”. PERI is playing an instrumental and successful role in the FOUR Frankfurt inner-city project with a wide range of systems from the formwork, scaffolding and climbing technology segments subject to the most stringent safety regulations and a sophisticated logistics concept.
11
elo
Dry docking and maintenance of “Stadt Zürich”, Zurich, Switzerland
The Zürichsee-Schifffahrtsgesellschaft (ZSG), with more than 100 employees, offers around 1.2 million passengers an idyllic experience year by year, framed by the panorama of the picturesque Swiss Alps. To ensure that the fleet of 17 ships can reliably cover 360,000 kilometres per year on Lake Zurich, it requires regular maintenance.
29
kesä
Milestone in the construction of the Fehmarnbelt Tunnel: PERI delivers 10,000 t of special formwork
With a length of 18 km, the Fehmarnbelt Tunnel will be the longest immersed tunnel in the world and is considered one of the largest infrastructure construction sites in Europe. PERI developed a formwork concept for the central production of the standard tunnel elements.
25
touko
The Tallest Residential Tower in Canada is beginning to rise with PERI Climbing Systems
The Pinnacle One Yonge project is a multi-phase development, designed by Hariri Pontarini Architects. With its prominent location, across from Toronto’s harbour, the sleek, masterfully designed towers will reshape the city’s skyline. The first three phases of the One Yonge project include residential towers that are 65, 105 and 92 storeys tall respectively.
18
huhti
PERI Suomi Ltd Oy:n toimitusjohtaja vaihtuu
PERI Suomen toimitusjohtajana kunniakkaat 20 vuotta toiminut Pekka Ylänne jää eläkkeelle tulevana kesänä. Hänen jatkajakseen on nimitetty latvialainen Egils Misans.
01
tammi
Various tunnel cross-sections with first fully hydraulic formwork carriage with caterpillar drive
The A26 project is one of the most important infrastructure projects in the Austrian city of Linz and the surrounding area with the goal to ease congestion on its urban transport network. The key to success during the project implementation stage was a PERI engineering solution that was innovative, safe and efficient in equal measure, coupled with comprehensive project support. The highlight: The first fully hydraulic tunnel formwork carriage with a caterpillar drive in Austria.
02
joulu
Customised formwork carriage cuts construction time by several months
At the south end of Frankfurt Airport, Terminal 3, with its futuristic design, is currently one of Europe’s largest infrastructure projects. Upon completion of construction in 2024, up to 19 million travellers will be able to arrive at and depart from the three new gates each year. PERI assisted Max Bögl with the construction of the drive-by platform, which will in future provide passengers with direct access to the departure level of Terminal 3.
22
marras
PERI is reflecting on a successful bauma 2022
With more than 200,000 visitors, the PERI exhibition hall at bauma 2022 was a visitor magnet. PERI is now reflecting on a very successful trade fair featuring numerous innovations from the formwork and scaffolding sector as well as exciting talks and discussions. In addition to a comprehensive facelift for the MAXIMO Panel Formwork, additions to the PERI UP Scaffolding Kit and ground-breaking key digital technologies, PERI showcased alternative and sustainable construction methods using MESH technology and TwistBlock Moulds.
27
loka
Innovative VARIOKIT Pier System – High performance for bridge pier construction
Simultaneously to bauma 2022, PERI will be presenting the VARIOKIT Pier System, a system on the market which aims to revolutionise bridge construction. PERI, one of the leading manufacturers and suppliers of formwork and scaffolding systems for the modern construction sector, is setting a new standard in bridge construction with the introduction of VARIOKIT Pier System (VPS). VPS brings together safety and efficiency to provide a versatile, high-performance system for the construction of bridge piers and pier caps. VPS is based on the VARIOKIT Engineering Construction Kit, which means that almost all project requirements can be met using rentable solutions.
24
loka
Achieving success in the scaffolding trade with PERI innovations
With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air site North (booth FN 719) from 24 to 30 October 2022 in Munich. A number of innovations that make scaffolding construction quicker, safer and more economical will be showcased. Something that is always at the heart of PERI’s developments is the long-term and sustainable success of the scaffolding contractor.
10
elo
Building bridges with solution expertise and modular systems
Customer-oriented planning and services combined with coordinated modular systems form the basis for developing formwork and scaffolding solutions that are suitable for almost any site requirements, including complex infrastructure projects. Experienced PERI engineers assisted with the construction of the Filstal Bridge, bringing their extensive solution expertise to bear.
21
heinä
New technology for demanding concrete structures
Weissenhorn/Zurich, 21.07.2022. PERI SE and Sika AG are taking a stake in the Swiss startup Mesh AG. Mesh AG has developed the world's first robot-assisted technology for the efficient and cost-effective production of complex reinforced concrete structures without formwork.
29
kesä
Synchronous climbing of all platforms: First use of the RCS MAX in South Korea
Only a few kilometres away from the South Korean capital Seoul, two new 140 m high luxury residential towers were built under strict safety requirements and within a tight construction time. PERI met the demand for efficient construction as well as low personnel costs with the new and innovative RCS MAX Rail Climbing System. A premiere, because RCS MAX was used here for the first time on South Korean soil.
28
kesä
PERI focuses on sustainability and future viability with innovations at bauma
From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the formwork and scaffolding manufacturer will have many more surprises in store for visitors. For example, PERI will be showing innovative further developments in the wall formwork sector as well as sustainable and digital additions for slab formwork systems.
28
kesä
PERI shows innovative solutions for the construction site of tomorrow at bauma
From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, PERI will have numerous other surprises in store. This will allow visitors to experience the comprehensive digital service and product portfolio as well as disruptive technologies at first hand.
28
kesä
PERI shows the future of scaffolding at bauma
From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the scaffolding and formwork manufacturer will have many more surprises in store for visitors. Among other things, PERI will be showing completely new innovations for scaffolding as well as further developments of the digital planning tools.
28
kesä
PERI at bauma: Innovative solutions for civil engineering
From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the formwork and scaffolding manufacturer will have many more surprises in store for visitors. Among other things, PERI will be showing innovations from the climbing formwork sector as well as further developments for civil engineering.
18
touko
PERI enables nine-month construction period while maintaining high safety standards
PERI supported the construction of the new campus of the Mohammed VI Polytechnic University (UM6P) in Rabat, Morocco. With reliability and customer focus, PERI managed to meet the tight construction deadline of only nine months and helped to ensure that the project was carried out according to strict safety standards. For this construction project, PERI used a just-in-time approach to supply a comprehensive overall solution from a single source, including the new ALPHADECK and HANDSET Alpha Panel Formwork as well as PERI UP Scaffolding solutions.
11
huhti
Mega Scaffolding Kit comes into its own in the heart of Zurich
Construction management firm Wanner + Fankhauser AG was responsible for planning and overseeing the general refurbishment of Bahnhofplatz 2 in Zurich. The building, built around 1890, was completely hollowed out with the exception of the steel beams, which were still intact.
07
maalis
Significant increase in efficiency through digital monitoring of concrete pressure
The PERI InSite Construction (ISC) Pressure Monitoring Set for formwork systems has won the British Construction Industry Award for Product Innovation of the Year 2021 as well as being recognised in two categories at the Festival of Innovation and Technology 2021. The digital solution helps to optimise the concreting process on the construction site, thus saving time and cutting costs.
13
tammi
Adherence to the weekly cycle with PERI VARIOKIT VIL Incremental Launching Facility
The Expressway S3 in western Poland, with a total length of 480.70 km, runs in a southerly direction from the port of Świnoujście to the border between Poland and the Czech Republic. PERI provided support for the section between Legnica and Lubawka. For the construction of the three bridge structures with two superstructures each, a comprehensive PERI solution with the VARIOKIT Incremental Launching Facility proved to be the key to success and was greatly appreciated due to reduced material quantities and time-saving handling.
26
marras
24
marras
16
marras
02
marras
28
loka
07
syys
06
elo
28
heinä
25
touko
13
huhti
08
maalis
24
helmi
12
tammi
08
tammi